Roll: Kenny, Robert, Randy, Kyle, Shanya
During work, Wyrick’s Shutoff was still not located.
Also, during work on the project, 4 more valves were located and the hydrant that was needing repaired got done.
The one call, call out information needs checked because Kyle never received call outs for the location for the project.
There may need to be an adjustment to the water usage to sewer usage for the residential customers due to summertime watering. Robert Wood is having issues with his billing; his meter may be bad.
Due to having purchased parts for the project, in case there were issues, we are getting pricing for containers to store said parts for future use.
Kyle mentioned the chlorine levels have been dropping during testing, he discussed it with DEQ to resolve the issue. Starting to level back out.